Free enquiry
We will calculate your savings
What happens next
From enquiry to the first kWh generated
Sending the form commits you to nothing. This is what the road looks like if you decide to work with us — every step with a clear output and a date.
We reply within 24 hours
An engineer reads your enquiry and calls you back. We pin down your consumption, the type of building and what you expect from the system.
Energy audit
We come out, measure your actual consumption and inspect the roof, the switchroom and the connection terms.
Design and quotation
You get a tailored design with calculated generation, savings and payback — including a grant-funded option and a PPA option.
Our work
Installation is done by our own certified crew. A system up to 500 kWp goes up in 10–14 working days.
Operation & service
We train your staff, set up remote monitoring and watch over generation for the whole life of the system.
